Sorry no pictures today but we have got the L&Y access line beyond the level crossings roughly levelled so work can start on level crossings. A piece of track has now replaced the lifted point. A team has completed the ballasting in the Dell still some to do from crossing to tunnel. David and Ray have continued on with the drystone wall

Monday working party from 0900