Sunday's To Do List


Too early to build but we can


  1. remove the shuttering, 

  2. tidy up the bits we have used

  3. Consider putting back some of the boards to protect work area

  4. Add some props to far end where there is a crack on the banking

  5. Clear up old retaining wall that is now demolished 

  6. Prepare for all the building materials arriving

  7. Get water butts set up at mixing point blue drum and round plastic dustbin

  8. Strengthen the top shoot ready for centre filling. 

  9. Need to plan to sort out that water leak



5 views

Registered charity 11114934

This site was designed with the
.com
website builder. Create your website today.
Start Now