Can we move from shared tunnel


At the end of 2015 members started to consider the possibility of moving the ground level track out of the shared tunnel. Many of you may not realise that the sharing of the tunnel causes operational problems for both tracks, delaying raised track trains and limiting the number of ground level trains. It also requires the interlocking of the two signalling systems to ensure that no two trains use the tunnel at the same time.

At this stage a number of members started to consider the possibilities.


14 views

Recent Posts

See All

Club Invite Wakefield

We have been invited to visit Wakefield at Thornes Park on the 3 August. Last year Fred, Andy and Howard visited. They are busy adding a raised 3.5 and 5" track but I am not sure if it is finished.

This site was designed with the
.com
website builder. Create your website today.
Start Now